English
pro-banner
Home » Products » Steel Drums&IBCS » Intermediate Bulk Containers » Normal 1000L IBC Ton Package » Normal 1000L IBC ton package

loading

Share to:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button

Normal 1000L IBC ton package

IBC ton package meets the high-capacity holding and requirement of the other party as follow:
1.1000L and 1250L IBC ton package, primary filling, primary sealing and primary labeling.
2. 20IBC ton packages, the loading capacity is up to 20000L.
3.IBC ton package can be packed in four layers.
Availability:
Quantity:

1. The nominal volume of the container is 1000L

2. The injection opening lid is firstly opened in use. Then the liquid is injected from the top injection opening. The reserved capacity must be retained to prevent from the container leakage or permanent deformation caused by liquid swelling by temperature in the transportation process. lt cannot be used for transporting the liquid that the steam pressure is higher than 110KPa at 50℃ on the steam pressure is higher than 130KPa at 55℃;The maximum and minimum transportation temperatures are 50℃ and -18℃ respectively, and all sealing elements are tightened before carrying.


1. The dead-weight type layout is designed in the container The top filling opening lid is firstly opened to prevent from generating negative pressure in the container in discharge.

2. The thread lid of the discharge valve is screwed off. The aluminum foil for sealing is peeled off if the valve nozzle is used, it is covered in the thread lid, and is replaced in the discharge valve with the gasket and tightened. lf the other appropriate substitute adapters are used for discharging, the adapters are only fastened by tools.

3. Then the lock screw at the bottom of discharge valve handle is discharged, and then the valve handle is wrenched ahead to discharge.

4. After being discharged, please close the valve coun- terclockwise, install the fastening screw, and close the sealing lid of discharge valve and filling opening lid.


The container is lifted from bottom, but the top lift mode is prohibited. lf the forklift is used, please follow the safety regulation of use of forklift.


Previous: 
Next: 
Professional products.
Passionately applied.

Quick Links

Product Category

Social Media
Contact Info
Contact person:Amber Mao
Tel:+86-0510-85996239
Fax:+86-0510-85995017
Mobile:+86-15061817591
QQ:546468115
E-mail:amber@wxsfgroup.com
Contact Form
Copyrights © 2022 Wuxi Sifang Group Co., Ltd. All rights reserved   Sitemap | Support by Leadong